Aug 23, 2023
Mälarenergi plant in Västerås, Sweden makes their own process evaluation which are being reviewed together with our experts – a valued cooperation.
Summary
Location | Mälarenergi, Sweden |
Challenge | Interprete results from own evaluations so that suitable measures are taken for improved performance. |
Solution | Having Valmet’s experts participate in reviewing evaluations and together deciding what measures to take so that the best result can be achieved and performance optimized. |
Result | A valued cooperation with improved performance, stable operation, and better shutdown planning. |
Technical summary - Valmet CFB Boiler, Combined Heat and Power plant (CHP)
Start-up date | 2014 |
Steam | 155 MWth, 74 bar, 470 °C |
Fuels | MSW, industrial waste, recycled wood, wood, peat |