Customer case:

Optimized control in different positions

May 29, 2020

Shanghai Taihe underground wastewater treatment plant processes 400.000 tons of sludge per day. The plant stabilizes sludge pumping process and optimizes polymer dosing with Valmet Total Solids Measurements (Valmet TS) and Valmet High Solids Measurements (Valmet HS).

We have seen the good performance of Valmet measurement in Bailonggang and Shidongkou Plant few years ago, this time we believe that the stable results can give us more space to improve the plant efficiency.
Zhang Jiwei, Product Manager, Shanghai Municipal Water Group

Summary

Location Shanghai, China
Customer challenge The plant wanted to measure the primary sludge clarifier pumping and dry cake after press machine. 
Solution

8 units of Valmet Total Solids Measurement (Valmet TS) for primary sludge clarifier pumping measurement.

4 units of Valmet TS and 1 unit of Valmet High Solids Measurement (Valmet HS) for dewatering process and dry cake measurement.

Results
  • Stabilized sludge pumping process
  • Optimized polymer dosing
Keywords Wastewater, Automation, China