Low-emission combustion with Valmet CFB Boiler
To meet its renewable energy target and the municipality of Pori’s industrial and municipal energy needs, Porin Prosessivoima invested in Valmet’s multifuel solution.
Recharge for moving energy producers’ performance forward
Today’s energy producers are facing many challenges: aging production facilities, cost pressures, challenging fuels, new emission regulations, and the rise of renewable energy sources. A recharge with Valmet can be an answer to these challenges.
Focus on fuel flexibility
The new multifuel boiler plant at Turun Seudun Energiantuotanto (TSE) is an excellent example of the best features of CFB technology, such as the possibility to use whatever fuel is currently available at the lowest cost.
Dalkia Facture - Full-scope solution for biomass processing
The delivery included the boiler, flue-gas cleaning and fuel handling systems. For the customer, centralizing the process equipment required for biomass handling with the same supplier reduces the likelihood of delays during construction and ensures that all equipment is seamlessly compatible.
Lahti Energia produces energy from waste efficiently and environmentally friendly
The world’s first power plant that runs solely on gasified recycled waste – on various types of industrial, commercial and building site waste as well as some household waste. In this way the plant boosts efficient and environmentally friendly energy production as well as reduces the use of fossil fuels significantly.
Sappi Kirkniemi taps into a new fuel opportunity
A side stream from oil refineries - asphaltene - is now a cost-effective fuel at the power plant at the Sappi Kirkniemi mill in Finland. The high fuel flexibility of Valmet CFB Boiler plays a key role in this outstanding example of a circular economy.
From waste to energy
Zibo Green Energy New Energy is the first in China to utilize Valmet’s advanced circulating fluidized bed (CFB) boiler technology. Besides raising its performance to the next level, their example is setting the direction for the entire municipal Waste to Energy segment.
Reliable conductivity measurements at Fortum Hässelby
Hässelby has been using Kemotron since 1971 and are happy with the performance and long lifetime of Valmet Conductivity products.
Winning with outsourcing
Uni Viridas delivers fuel and sells heat and electricity from their biomass power plant in Babina Greda, Croatia. Everything else is looked after by Valmet. This successful cooperation was continued with the operation and maintenance contract’s extension in early 2019.
Long cooperation key to successful upgrade
Scotland’s largest biomass plant, E.ON’s Steven’s Croft biomass power station in Lockerbie, Scotland, relied on Valmet and its local service during a recent major boiler upgrade – the same way as many times earlier.
Page 301 of 786