Valmet Recovery Boiler and Ash Leaching at ITC Bhadrachalam
ITC replaced three smaller recovery boilers with a single, high power recovery boiler to support increased pulp production. The new boiler, equipped with advanced ash leaching systems, has delivered strong reliability, over 18 months runnability between shutdowns, and improved operational stability—while also increasing the company’s renewable energy share from 43% to 53%.
Insights ● Video