Valmet MAXUM II Operation with GCP Level 1-US

Training type
Scheduled
Start date
End date
Duration
4
Location
Houston TX 77041, United States of America
Description
Objective
Audience
Pre-requisites
Registration information

Thank you for your interest.

Please send your enrollment information to AS.NA.Maxum.Training@valmet.com with below required information.

• First Name & Last Name

• Company name & address

• Student Email Address

• Student Phone number

• PO number

• The class ID and start date you would like to enroll.

 

Payment

Currently credit card payment is not available, but it is under development. Please send PO to the email at AS.NA.Maxum.Training@valmet.com.

PO issue-to:

Our legal entity name is “Valmet, Inc.” and DBA (Do Business As) “Gas Chromatography System Maxum LLC”.

Gas Chromatography System Maxum LLC is our business unit under Valmet, Inc.

Class status:

Our training schedules are dynamic and are updated daily. We are unable to save seats without the registration process being completed and order payment confirmed. Classes are subject to cancellation. The class status will be confirmed 2 weeks before class start date, either confirm or cancel based on the enrollment qty.

Cancellation Policy:

The following is the cancellation policy for open enrollment classes:

  1. You will be charged 75% of the total price (tuition and add-ons) for cancellations made within 5 business days of the start of class.
  2. You will be charged in full (tuition and add-ons) for students who fail to show up for class without prior notification or for cancellations made on the start date of the class.
Deadline for registration
Tuition fee
3300

Agenda

Topics:

1.Maxum System Overview

2.Maxum GCP Overview

3.Maxum Hardware Overview

4.Maxum Valve Maintenance

a. Model 50

b. Model 11

c. Liquid Inject

5.Maxum Detectors Maintenance

a. Flame Photometric

b. Flame Ionization

c. Thermal Conductivity

6.System Addressing

a. IP Addressing

b. SNE/Internal Bus Addresses

c. Add an I2C IO Card

7.Maxum Chromatograph Hardware

a. Oven configurations

b. Utility Requirement

c. Module Wiring/Connections

8.Parallel Chromatography

a. Applets

b. Hardware Timing

c. Flow Settings

9.GCP Method Software

a. Method Setup

b. Integration Options

c. Auto Gating

d. Named Peaks

e. Group Peaks

f. Sequences

g. Off Line Calibration

10.Color Touch Screen Control Interface Module (CIM)

a. HMI Menus

b. Menu Navigation

c. Alarms

d. Basic HMI Operations

e. Modify the Chromatograph Method

11.Labs

a. Save Database Tables

b. Analyzer Calibration using CIM

c. Analyzer Calibration with GCP

d. Modify Methods

e. Set Valve Timing

f. Run Setup and Main Detector Chromatograms

g. Set Flows

h. Perform Model 50 Valve Maintenance

i. Identify Maxum Hardware Components