Boiler performance monitoring
Valmet DNA Boiler Performance Monitoring provides power plant personnel with valuable information about boiler performance, condition and operating efficiency.
Fuel management
Valmet DNA Fuel Management for power plants' fuel supply chain management and delivered fuel quality monitoring.
Valmet Paper Lab
Valmet Paper Lab is a fully automatic, heavy duty testing system for paper and board applications. With a wide range of measurement modules to meet the widely varying needs of different mills, it offers a package optimized for top performance.
Valmet DNA Integrated automation system (IAS) for marine
The Valmet DNA integrated automation system (IAS) controls, monitors and integrates all ship’s systems. This includes machinery, propulsion and HVAC systems, the electric power plant, cargo plant and much more.
Better awareness with accurate scrubber control and monitoring
The control and monitoring of SOx scrubbers can easily be connected to the main automation system of the vessel, Valmet DNA. System integration means a common user interface, making the operator’s work quicker and easier.
Transparency for water treatment
Valmet’s solution enables the operator to monitor the water treatment system from the engine control room or a local control panel.
Automation for pharmaceutical
Valmet's automation offering is aimed at increasing efficiency and uplift in production. Through our expertise, we provide seamless integration and upgrades, for a long lifecycle approach to automation.
Maximized system availability for efficient control of the power management system
Valmet’s power management system is a fully integrated concept covering functions for all types of engines, generators, motors and switchboard arrangements of basic and advanced plants.
Great teamwork helps Joutseno mill startup biggest-ever TwinRoll VPE press ahead of schedule
Valmet has successfully delivered and started up a new TwinRoll™ VPE-1245 dewatering press at Metsä Board’s Joutseno pulp mill in Finland.
Liansheng BCTMP line 1 in phase 2 started up
On September 3, 2025, at 10:20 a.m., Liansheng Paper (Zhangzhou) Co., Ltd. successfully commissioned line 1 of Phase 2 of its bleached chemi-thermomechanical pulp (BCTMP) project.
Page 580 of 759